| |
| Education |
| Currently Enrolled (PhD program) |
| M.S. Architecture & Urban Design |
|
| Research Projects |
| 2004-2005 | CIS/2 IFC Harmonization | | The project is an industrial funded project to harmonize CIS/2 (LPM6) information with IFC 2x2 (ST4). The two scopes of this project include 1) define the exchangeable information set between IFC and CIS/2 based on Used Case scenario; 2) implement CIS2-to-IFC (and versa verse) translators. |
| 2000-2004 | AISC CIMSteel (CIS/2) Deployment | | The project has been funded by AISC and led by Prof. Eastman since 2000. CIS/2 was adopted by AISC as the standard data model for their new EDI (Electronic Data Interchange) effort. There are over 12 software vendors who support data exchange through CIS/2. |
| 2002-2004 | FabTrol CIS/2 Relational DB | | The project is funded by AISC, FabTrol Co. and led by Prof. Eastman. My contribution includes implementing the interface between FabTrol internal DB and the GT CIS/2 relational database. The CIS/2 database is to be commercial FabTrol Co. in future release. |
| 2002-2004 | Data Visualization and Query of Product Model Repository | | Development of a data viewer and graphic query interface for a generic product model repository |
| 2003-2004 | CATIA-to-CIS/2 Transaltor | | The first phase of the project is funded by AISC to develop a CIS/2 translator on the structural bench of CATIA Dassualt. The main task is to export design CIS/2 model from CATIA V5.R10 (and later). The second phase of the project will be directly supported by Ghery's Technology. The project is currently under a contractual peroid | |
| Practice |
| 1999-2000 | Hanson Design Group, Pittsburgh, PA, USA |
| Associate Designer | | Renovation of historical landmark- Schiller and Greenfield Elementary School |
| 1997-1998 | C.F. Wang Architect Assoc., Taipei, Taiwan |
| Construction Supervisor | | On site coordinator and supervisor
Supervised projects include the Taichung Supreme Court and Court Dormitory |
| 1996-1997 | C.F. Wang Architect Assoc., Taipei, Taiwan |
| Project Designer | | Designer of the Taichung Supreme Court and Court Dormitory | |
| Teaching |
| 1997-1998 | Choa-Yang Inst. Tech.Taichung, Taiwan |
| Studio Instructor | | Design Studio Instructor and co-Lecturer of design theory |
| 1993-1994 | National ChungKung Univ.Tainan, Taiwan |
| Teaching Assistant | | Teaching basic design (1st Year Studio) and drafting course | |
| Publication |
| Journal | | C. Eastman, F. Wang, S-J You, D. Yang,(2004). Deployment of an Industry Sector Product Model. CAD Journal (in review). . | |
| Conference Proceedings | | Wang, F. L., Eastman, C. M.,(2004). A Framework for Developing a 3D Graphic Query System on a Generic Product Model Repository. Proceeding of the G-CAD'04 conference 2004. Pittsburgh, PA. | |
| Wang, F. L.,(2003). Development of a New CIS/2 (CIMSteel Integration Standards) Model Viewer. Proceeding of CAAD Futures 2004. Tainan, Taiwan.. | |
|
|
| Consulting |
| 2005-2005 | Gehry Technologies, Los Angeles |
| Contractor | | I was invited to become a consultant at Gehry Technologies (Contract No. ???) . Consulting services include 1) Providing tutorials to introduce IFC; 2) Providing training sessions for GT developers on STEP Toolkits and introduction to STEP and EXPRESS; 3) Assisting developer to build prototype exporting interface between Digital Project and IFC standard format. |
|
| |
| |
| |
|
|
|